Type: poor leveling, obvious construction traces
Status description or reason:
1. The paint itself is not well leveled;
2. The paint is close to the gel during construction;
3. There are too few materials for construction;
Approach
1. Formulation rectification or qualified materials;
2. Adjust the construction progress and dosage;
3. Construction according to design dosage;